SOLAREC dairy needed to reduce their daily wastewater discharge, eliminate city water dependence, maintain water quality standards, reduce pollutants, and increase treatment capacity to support growth.
A phased implementation approach spanning 2012-2023 including: installation of buffer tank and DAF system (2012), POTA 1 with advanced treatment technologies (2014), POTA 2 with MBR system (2017), and POTA 3 with innovative CaptuRO™ technology (2023).
Download the case study to get the results!