The client had identified the need to replace the existing water treatment system in one of its lab buildings, which had reached the end of its operational life.
We used online questionnaires and in-person meetings with tenants to gather information, but the planned bench-top installation approach proved unviable. Instead, two Terion S units were installed to replace the existing single unit - marking the first UK scientific application of Terion S. The upgrade also included new pre-treatment, UV treatment, and control panels.
Download the case study for the results.