A major biopharmaceutical supplier required an emergency replacement for their failed purified water generation unit over the Christmas period to maintain continuity of their Water for Injection production.
Veolia rapidly deployed an IonPro MkII mobile water treatment unit on Christmas Eve, commissioning it within days of the initial enquiry to provide a seamless, fully supported purified water supply with no production downtime while the client's existing system was repaired.
Download the case study for the results.