United Kingdom
Contact us
Head Office UK

Veolia Water Technologies UK
Windsor Court,
Kingsmead Business Park,
High Wycombe, HP11 1JU

+44 (0) 1628 879 704

Contact Us

Other Locations

Veolia Water Technologies UK
Whittle Road, Meir,
Stoke-on-Trent, ST3 7QD
tel: +44 (0) 1628 81 41 90
fax: +44 (0) 1628 81 41 96

Veolia Water Technologies UK
Orbital House,
Redwood Crescent,
East Kilbride, G74 5PR
tel: +44 (0) 1355 58 81 40
fax: +44 (0) 1355 58 81 41

Power Station - Consent to discharge

Mobile Solutions solves consent to discharge problem at UK Power Station

The Client

A 140MW oil fired open cycle gas turbine (OCGT) station based in Cornwall, UK. The Power Station operates as a peak lopping station, which means that it runs only infrequently, and predominantly in the winter months when demand is high.

The Client's Needs

During the summer, the station uses about 40m3 per day of deionised water, but in winter the demand rises to about 170m3/day. To produce this high quality water, an ion exchange plant with its associated regenerant chemicals and effluent discharge is required.

Click Case Study To Find Out More

Online shop